Solar farm drone mapping software that checks array block grading against design and reports cut and fill before the pile crew arrives
Solar farm drone mapping software turns a flight over a utility-scale site into an orthomosaic, a terrain model and a cut and fill map against your design grade, so the civil crew finds a high spot before the pile driving rig does. DroneMapping processes the photos in the browser, takes your design surface as a GeoTIFF and reports cut, fill and net cubic yards per array block, plus contours and a GCP checkpoint report. Team is $1,488 a year with 10 seats, so the EPC, the grading sub and the owner's engineer can all open the same map.
net volume
net volume
Why grading gets checked from the air
Pile tolerances are tight and the site is large
Tracker rows follow the ground, and pile installers want a slope that stays inside the tracker's limit from one pile to the next. A single block can be 10 to 20 acres, and a utility-scale site has dozens of them. Walking a grid with a rover finds the problem points, but it is slow and it leaves gaps between the shots. A drone surface covers every square foot, so a ridge that crosses three rows shows up as a red band on the map and not as a surprise on pile day.
- Every block compared with the design grade, cell by cell
- Cut and fill in cubic yards per block, ready for the grading sub's change order
- Contours and a terrain model of the bare ground between rows
- One link the owner's engineer opens without a seat
Deliverables
What a solar site flight gives you
Upload geotagged JPEGs from any mapping drone. You get an orthomosaic exported as GeoTIFF, a digital surface model, a digital terrain model with vegetation and structures filtered out, contours as DXF or SHP, and on Team and above a cut and fill raster and a PDF report. Place ground control or checkpoints and the accuracy report gives the error in X, Y and Z, so the numbers can go to the engineer with the method stated. The grading comparison itself is described on the cut and fill software page, and the surveying workflow is on the drone survey software page.

Worked example
One 12 acre block, from cut and fill to dollars
A 12 acre array block was graded last week. The drone surface compared with the design grade shows the average high spot across the block at 0.25 feet. These figures are an example to show the arithmetic, so use your own area and rates.
| Step | Value |
|---|---|
| Block area | 12 acres, 522,720 square feet |
| Average excess over design | 0.25 feet |
| Excess volume | 130,680 cubic feet, 4,840 cubic yards |
| Cost to move at $6 a cubic yard | $29,040 |
| Seat cost for the flight on Team | Included in $1,488 a year |
A block that is 0.25 feet high on average is a five-figure regrade, found while the grading crew is still on site. The same map, flown again after the regrade, shows the block inside tolerance and gives the engineer a dated record. Because the comparison runs cell by cell, it also shows where the excess sits, so the crew re-cuts the ridge and not the whole block.
How it works
From the field to a signed-off block
1. Set a few ground control points or checkpoints around the block and fly with 75 percent front and 70 percent side overlap.
2. Upload the photos and the design surface as a GeoTIFF in the project coordinate system.
3. Read cut, fill and net per block on the map and export the table as CSV.
4. Send the view link to the grading sub, the EPC and the owner's engineer.
5. Fly again after the regrade and compare against the same design surface.
Each flight stays on one timeline, so the weekly progress picture is a set of maps and not a folder of photos. The drone progress monitoring software page shows the timeline view.
How the options compare
Solar farm mapping software by what you pay for the grading check
Prices are published list prices checked in October and November 2026. Check your own quote before you buy, because resellers bundle.
| Option | Published price | Cut and fill against a design | Who can open the results |
|---|---|---|---|
| DroneDeploy Flight & Analysis | $4,188 a year for 1 admin user | On a quoted higher plan | Shared links |
| Pix4Dmapper | $3,990 a year | Needs a separate CAD or survey package | One license, desktop |
| Agisoft Metashape Professional | $3,499 once per computer | Build both surfaces yourself | One computer |
| DroneMapping Team | $1,488 a year, 10 seats | Included, design surface as GeoTIFF | 10 seats plus view links |
The side by side with a printed cloud price is on the DroneDeploy alternative page, and every tool with its price is in drone mapping software pricing.
Honest fit
When this is not the right tool
DroneMapping does not process thermal or LiDAR data, so module inspection with a thermal camera and under-canopy terrain work need another tool. It processes up to 500 photos per flight, so a 20 acre block is usually one flight and a whole site is several. Paid drone work in the US needs a Part 107 certificate, described on the FAA commercial operators page. It compares surfaces and reports volumes. It does not place piles, design the array or replace a licensed surveyor's stamp.
Try it first
See a design comparison in the demo
The demo loads an earthworks pad on a public elevation surface. Switch on cut and fill, read the net volume and open the contours. No account is needed.
Pricing
What a grading check costs per year
Starter is $99 a month or $588 a year with 3 seats and 3,000 images a month. Team is $249 a month or $1,488 a year with 10 seats, 15,000 images a month, design surfaces and GCP reports, enough for a site flown weekly across many blocks. Business is $599 a month or $3,588 a year with 25 seats and the progress timeline with change detection for a contractor with several sites. The price does not change when you add a block or a site.
Questions
Solar farm drone mapping software FAQ
The best fit is software that compares the flight with the design grade and reports cut and fill per block, with seats for the whole project team. DroneMapping does this on Team at $1,488 a year with 10 seats. Thermal inspection needs a separate tool.
Fly the block, build a surface model, subtract the design surface and read the cut and fill map. Red cells are above design and blue cells below. Fly again after the regrade to confirm the block is inside tolerance.
With ground control or checkpoints the report states the error in X, Y and Z, and vertical error is usually a few centimeters on a well flown site. Check the report against your tolerance before you sign off a block.
Yes, up to 500 photos per flight. Fly the site block by block, upload each flight and compare each block with its own part of the design.
No. DroneMapping does not process thermal imagery. It covers maps, terrain, volumes and grading checks.
Check the next block against design before the piles go in
Fly the block, compare it with the grade and send the map to the crew.